Kruisweg 1 5406 PB Uden Nederland
C40 Recharge (XK), SUV, 2021 / 2024 Recharge Twin 78 kWh
C40 Recharge (XK), SUV, 2021 Recharge Twin 78 kWh
(XK) - 2022 Recharge AWD NB Elektrisch 300kW (408pk) 4x4
F-Pace, SUV, 2015 / 2025 2.0 D 180 16V
Grand C-Max (DXA), MPV, 2010 / 2019 1.6 SCTi 16V
2008 (UD/UK/UR/US/UX), MPV, 2019 1.2 VTi 12V PureTech 100
5 (CR19), MPV, 2004 / 2010 1.8i 16V
Fiesta 6 (JA8), Hatchback, 2008 / 2018 1.6 16V Sport
Cee'd (JDB5), Hatchback 5-drs, 2012 / 2018 1.0i T-GDi 12V 120
Q7 (4MB/4MG), SUV, 2015 3.0 TDI V6 24V e-tron plug-in hybrid
Cayenne II (92A), SUV, 2010 / 2018 3.0 D V6 24V
Space Star (A0), Hatchback, 2012 1.0 12V